Theo Todman's Web Page - Notes Pages


Status Reports

Status: Summary Task List (YTD: 25Q4 - 26Q2)

(Work In Progress: output at 12/05/2026 10:16:44)

Previous VersionsNote ReferencesNote Citations


This is a list of the tasks performed on my various projects since the beginning of the 2025-26 academic year. It is automatically generated from my time-recording system, so is fairly crude. See also the Quarterly Report1. This Annual Report is mostly for use for the "inactive" projects for which commented Quarterly Status reports are not produced. Projects are in priority sequence, broken down by sub-project where appropriate. If the project name has a superscript, clicking on the name will take you to the last published report for this project. To jump to the Project task-lists, click on the links in the list below:-

  1. Thesis (For the latest Status Dashboard, Click Here2)
  2. Thesis Background
  3. Website
  4. Website Others
  5. Religion
  6. Religion Background
  7. Music
  8. Bridge
  9. GeneralCulture
  10. Languages
  11. Chess
  12. Mathematics
  13. HiQ
Links to the latest time-analyses are given first.
  1. Total Time outstanding this period = 465 hours
  2. Click Here3 for Actual Detail Summary (2007 - 2026) by Sub-Project
  3. Click Here4 for (by Project)
    • Summary of Effort YTD & QTD
    • Time Analysis (YTD by Study-location)
  4. Click Here5 for (by Project)
    • Plan versus Actual Effort Summary - Split (Previous Quarter & YTD)
    • Plan versus Actual Effort Summary - Actual (Previous Quarter & YTD)
    • Plan Summary (Next Quarter & Full Year)
    • Actual & Plan Summary (2007 - 2026)
Project 1: Thesis6 (Total Hours = 324.25)
  1. Thesis - Reading / Writing (Total Hours = 308)
  2. Thesis - Discussions
  3. Thesis - Research Repositioning (Total Hours = 13.75)
Project 2: Thesis Background (Total Hours = 48.5)
  1. Thesis Background - Reading / Writing (Total Hours = 35.75)
  2. Thesis Background - Status (Total Hours = 12.75)
Project 3: Website7 (Total Hours = 131.25)
  1. Website - Bridge Development (Total Hours = 32.5)
    • Software Development - Bridge Database - Add Dave T to NGS Capture (2.25 hours)
    • Software Development - Bridge Database - Add extra NGS Information for Results Export (2.5 hours)
    • Software Development - Bridge Database - Improve efficiency of NGS & Results Hyperlink calculation for Results Export (4 hours)
    • Software Development - Bridge Database - Revive Essex & Add Herts & Beds for NGS Capture (23.75 hours)
      → See "Software Development - Website - Development" (32.5 hours)
  2. Website - Bridge Maintenance (Total Hours = 27)
    • Bridge - Website - Theo Todman's Bridge Page8 Maintenance (2 hours)
    • Bridge - Website - Results Database Maintenance (23.75 hours)
    • Bridge - Website - Results Database Maintenance - Fixing Mountnessing Links (1.25 hours)
      → See "Admin - Bridge - Admin" (27 hours)
  3. Website - Development (Total Hours = 14)
  4. Website - Education
  5. Website - Infrastructure (Total Hours = 26.25)
    • Bibleworks re-installation (0.25 hours)
    • Brother Laser Printer & Scanner - Disposing of, together with loads of old electrical junk (2 hours)
    • Commissioning Scanner on Epson Printer (0.25 hours)
    • Cross-checking Windows Defender (0.25 hours)
    • Develop & maintain procedures for junking US Healthcare spam (2 hours)
    • Epson ET-2850: iPhone Epson Smart Panel App to check Ink Levels (0.5 hours)
    • Epson Inkjet - Problems with Duplex Unit (0.25 hours)
    • Fitbit - Reviewing Fitbit Premium re renewal or cancellation (0.25 hours)
    • Fitbit Watch - Comissioning (1 hour)
    • Install what3words on iPhone (0.25 hours)
    • Installing GIMP Image Manipulation Program on new Laptop (0.25 hours)
    • Investigating, Purchasing & Commissioning New Wondershare PDF Element (3.25 hours)
    • iPhone Cables (0.25 hours)
    • Julie's Laptop - Sundry troubleshooting (1.5 hours)
    • Laser Printer - Brother HL-6050D drivers dropped by Windows 10 (and Windows 11) (1.5 hours)
    • Logitech Mouse died (0.25 hours)
    • Microsoft Windows & MS Office - Releases, Bugs & Periodic Re-boots (6 hours)
    • Namesco Renewals (1.5 hours)
    • Namesco Renewals: Plan to move to Hostinger? (0.25 hours)
    • PC Backups / OneDrive (1 hour)
    • XMas Mug - photos & formatting (1.5 hours)
    • XMas Newsletter - editing, photos, formatting & printing (2 hours)
      → See "Admin - Website - Admin & Maintenance" (26.25 hours)
  6. Website - Maintenance (Total Hours = 19)
Project 4: Website Others (Total Hours = 117.75)
  1. Website Others - A1WaspsAndBees
  2. Website Others - Enigma Ensemble
  3. Website Others - Hutton DBC Maintenance (Total Hours = 12.25)
    • Admin - Hutton Website - Admin & Maintenance - Import from EBU (9 hours)
    • Admin - Hutton Website - Admin & Maintenance - Import from EBU (Wednesdays - St. Edith's) (3.25 hours)
      → See "Admin - Hutton Website - Admin & Maintenance" (12.25 hours)
  4. Website Others - Mayflower DBC Maintenance (Total Hours = 25.25)
    • "Admin - Mayflower Website - Admin & Maintenance" (7.25 hours)
    • Mayflower Scoring Laptop - EBUScore & BridgeMate Control Software - Individual Tournament Set-up (2.5 hours)
    • Mayflower Scoring Laptop - Install Bridge Timer (1 hour)
    • Mayflower Scoring Laptop - Loading Deals (0.25 hours)
    • Mayflower Scoring Laptop - Manual Scoring (1.75 hours)
    • Mayflower Scoring Laptop - Problems with EBUScore & BridgeMate Control Software (4.75 hours)
    • Mayflower Scoring Laptop - Reading EBUScore & BridgeMate Control Software Manuals (0.25 hours)
    • Mayflower Scoring Laptop - Windows Updates (6.75 hours)
    • Mayflower: Set up Google account & GMail address for Club (0.75 hours)
  5. Website Others - Mountnessing DBC Maintenance (Total Hours = 66.25)
    • Admin - Mountnessing Website - Alaric re Recovery (14.5 hours)
    • Development of Mountnessing 'Small Site' (17.25 hours)
    • Development of Mountnessing 'Small Site' - Bug Fixes (3 hours)
    • Development of Mountnessing 'Small Site' - Attendance Page (4.5 hours)
    • Development of Mountnessing 'Small Site' - Control Page (4.25 hours)
    • Development of Mountnessing 'Small Site' - Data Conversion (5 hours)
    • Development of Mountnessing 'Small Site' - Data Grab (9.5 hours)
    • Development of Mountnessing 'Small Site' - Photos Page (4.5 hours)
    • Mountnessing - Domain Name investigation (0.25 hours)
    • Mountnessing 'Archive' Site - Adjust links to new 'Small Site' and add text (3.5 hours)
      → See "Admin - Mountnessing Website - Admin & Maintenance" (66.25 hours)
  6. Website Others - Small Bridge Sites
Project 5: Religion19 (Total Hours = 8.5) Project 6: Religion Background (Total Hours = 60.25)
  1. Religion Background - Reading / Writing (Total Hours = 16.25)
  2. Religion Background - Admin (Total Hours = 9.25)
  3. Religion Background - Discussions (Total Hours = 34.75)
    • Interaction - Discussions with Julie's Church Group (2 hours)
    • Interaction - Discussions with Mike, Sylvia & Julie (10.25 hours)
      → See "Interaction - Religion - Discussions" (12.25 hours)
    • Interaction - Discussions with Pete, Caro & Julie (0.75 hours)
    • Interaction with Julie, Pete, Caro, Mike, Sylvia, Nev, Hazel, Willie & Gill on Holiday (18.75 hours)
    • Planning & Interaction with Pete, Julie, Sylvia, etc, re Holiday (2.5 hours)
      → See "Interaction - Discussions with Pete" (22 hours)
    • Sylvia re Sumerian Brian Bilston (0.5 hours)
      → See "Interaction - Religion - Discussions" (0.5 hours)
Project 7: Music20 (Total Hours = 250.5)
  1. Music - Administration (Total Hours = 159.5)
    • 25Q3 Status Reports (2.25 hours)
    • 25Q4 Status Reports: Music (2 hours)
    • 26Q1 Status Reports (0.75 hours)
    • Enigma Ensemble - Admin (83 hours)
    • Enigma Ensemble - Admin - Advertising in The Resident (0.25 hours)
    • Enigma Ensemble - Admin - Musescore Renewal (0.25 hours)
    • Enigma Ensemble - Admin - Musescore Upgrades (0.25 hours)
    • Enigma Ensemble - Concert Planning (8 hours)
    • Enigma Ensemble: Travel, Lunch, Interaction (15.75 hours)
    • Fixing Julie's Groove-e Boombox (0.25 hours)
    • Fixing Julie's Violin pegs (0.25 hours)
    • Flyers for Offshoots (0.75 hours)
    • Investigating piano for Lili (1.5 hours)
      → See "Admin - Music - Administration" (115.25 hours)
    • MuseScore - Bach - Air on a G String (5.5 hours)
    • MuseScore - Binge - Watermill (1.5 hours)
    • MuseScore - Gounod - Marionette - Oboe Score Adjustment (1 hour)
    • MuseScore - John Ireland - Downland Suite - Minuet (0.5 hours)
    • MuseScore - Miller of Dee (0.5 hours)
    • MuseScore - OBT Oboe-Violin Duets (3 hours)
    • MuseScore - Old Ned (0.5 hours)
    • MuseScore - Trombey - Eye Level (Piano part) (1 hour)
    • MuseScore - Various New Items (1 hour)
    • MuseScore - Warlock - Boccherini - Minuet & Trio (Sax parts) (0.75 hours)
    • MuseScore - Warlock - Capriol - Danse (4 hours)
    • MuseScore - Warlock - Capriol - Pavane (Tenor Sax) (0.5 hours)
      → See "Todman (Theo) - Music Score OCR & Editing Software - Selection & Use" (19.75 hours)
    • Music Copying / Filing (8.5 hours)
    • Music Copying / Filing - Offshoots (0.75 hours)
    • Oboe reeds - research / purchase (0.75 hours)
    • OBT Weekend - Oboe / Violin Duets - Organisation (3.5 hours)
    • Offshoots Dinner - General Discussions - Music (1 hour)
    • Opera - Carmen (5.5 hours)
    • Opera - Madama Butterfly (4.5 hours)
      → See "Admin - Music - Administration" (24.5 hours)
  2. Music - Aural
  3. Music - Oboe (Total Hours = 76.25)
    • Mower (Mike) - The Good Tempered Oboe - 'Dop Dop Doobah' (0.5 hours)
    • Mower (Mike) - The Good Tempered Oboe - 'Enlightenment' (0.25 hours)
      → See "Mower (Mike) - The Good Tempered Oboe" (0.75 hours)
    • Oboe - Corelli - Christmas Pastorale (1 hour)
    • Oboe - Enigma Ensemble (21 hours)
    • Oboe - Enigma Ensemble - Practice (42 hours)
    • Oboe - Enigma Ensemble - Practice - Bach Organ Sonata No. 4.II (Andante) (1 hour)
    • OBT Weekend - Oboe / Violin Duets - Practice (10.5 hours)
      → See "Practice - Oboe - Enigma Ensemble - Playing & Practice" (75.5 hours)
  4. Music - Piano (Total Hours = 1.25)
  5. Music - Recorder (Total Hours = 12.25)
Project 8: Bridge21 (Total Hours = 794.5)
  1. Bridge - Reading / Writing
  2. Bridge - Admin (Total Hours = 214)
    • 25Q3 Status Reports (7.75 hours)
    • 25Q4 Status Reports: Bridge (2.5 hours)
    • 26Q1 Status Reports (2.75 hours)
      → See "Admin - Bridge - Admin" (13 hours)
    • Admin - Bridge - Mountnessing Village Hall (MVH) Trusteeship (7 hours)
      → See "Admin - Bridge - Mountnessing Village Hall Trusteeship" (7 hours)
    • Admin - Mayflower DBC - EBUScore Training (1.25 hours)
    • Admin - Mayflower DBC - ECATS SIMS Preparation (0.75 hours)
    • Admin - Mayflower DBC - Lunch with DP & AK (3.25 hours)
    • Admin - Mayflower DBC - Lunch with DP & JMcC (3 hours)
    • Admin - Mayflower DBC - Lunch with DP, AK & TC (3.5 hours)
    • Admin - Mayflower DBC - Lunch with DP, AK, JMcC & TC (11.75 hours)
    • Admin - Mayflower DBC - NICKO Organisation (8.75 hours)
    • Admin - Mayflower DBC - Planning Zoom Meetings (0.5 hours)
    • "Admin - Mayflower DBC - Secretarial & Signatory Duties" (125 hours)
    • Admin - Mid Essex - Fletcher Organisation (0.25 hours)
    • Bridge - Discussions with Chris (0.25 hours)
    • Bridge - Emails / Calls to Colin (0.75 hours)
    • Bridge - Emails / Calls to David P (5 hours)
    • Bridge - Emails / Calls to DV (0.25 hours)
    • Bridge - Emails / Calls to Tim C (0.25 hours)
    • Bridge - Emails to / Discussions with Albert (1.25 hours)
    • Bridge - Emails to / Discussions with Dave T (2.75 hours)
    • Bridge - Emails to Angie (2.25 hours)
    • Bridge - Emails to Robert (0.25 hours)
    • Bridge - Marc Chawner re ECBA Selection (0.5 hours)
    • Bridge - MK Payments (0.5 hours)
    • Bridge - Planning EBU & ECBA Sessions for 2026 (5 hours)
    • Bridge - Planning EBU Sessions with Dave T (2.25 hours)
    • Bridge - Planning EBU Sessions with David P (2.25 hours)
    • Bridge - Ranked Masters - Admin (4.25 hours)
    • DP Bridge Party - Meal & Socialising (4 hours)
    • Tony French's Funeral + Wake (4.25 hours)
      → See "Admin - Bridge - Admin" (69 hours)
  3. Bridge - Play (Total Hours = 323.5)
    • Bridge - Chelmsford (Albert) (3 hours)
    • Bridge - Cornell Trophy (David P) (6.25 hours)
    • Bridge - Cumbria - RealBridge (Dave T) (7.5 hours)
    • Bridge - Cumbria - RealBridge (David P) (2.5 hours)
    • Bridge - DP Bridge Party (13.75 hours)
    • Bridge - EBU National Pairs East Qualifier - RealBridge (Dave T) (6.25 hours)
    • Bridge - EBU National Pairs Final - RealBridge (Dave T) (12 hours)
    • Bridge - EBU OODGP Swiss Pairs - RealBridge (Dave T) (25.75 hours)
    • Bridge - EBU Ranked Life Masters Pairs - RealBridge (Dave T) (11.75 hours)
    • Bridge - Leighton Buzzard - RealBridge (Colin) (2.5 hours)
    • Bridge - Leighton Buzzard - RealBridge (David P) (6.25 hours)
    • Bridge - Mayflower (Bernard K) (3.25 hours)
    • Bridge - Mayflower (Colin) (9.25 hours)
    • Bridge - Mayflower (David P) (71.25 hours)
    • Bridge - Mayflower (Linda) (6.75 hours)
    • Bridge - Mayflower (Tim C) (3.25 hours)
    • Bridge - Mid-Essex - Friday (Albert) (13.25 hours)
    • Bridge - Milton Keynes - RealBridge (Dave T) (102.5 hours)
    • Bridge - Milton Keynes - RealBridge (David P) (10.75 hours)
    • Bridge - NICKO Round 1 (Mayflower vs Deva BC E) (3 hours)
    • Bridge - NICKO Round 2 (Mayflower vs Cambridge B) (2.75 hours)
      → See "Admin - Bridge - Playing" (323.5 hours)
  4. Bridge - Study (Total Hours = 247.5)
    • "Bridge - Handle" (61.5 hours)
    • Bridge - NICKO Round 1 (Mayflower vs Deva BC E) - Setup, Socialising & Session Reviews (0.5 hours)
      → See "Admin - Mayflower DBC - Secretarial & Signatory Duties" (0.5 hours)
    • Bridge - Session Reviews - Albert (4.25 hours)
    • Bridge - Session Reviews - Bernard K (1 hour)
    • Bridge - Session Reviews - Colin (4.25 hours)
    • Bridge - Session Reviews - Dave T (60.75 hours)
    • Bridge - Session Reviews - David P (42 hours)
    • Bridge - Session Reviews - DP Bridge Party (1 hour)
    • Bridge - Session Reviews - Linda (1.75 hours)
    • Bridge - Session Reviews - Tim C (1.5 hours)
    • Bridge - Systems Review - Albert (2.75 hours)
    • Bridge - Systems Review - Bernard K (0.5 hours)
    • Bridge - Systems Review - Colin (5 hours)
    • Bridge - Systems Review - Dave T (36 hours)
    • Bridge - Systems Review - David P (19.75 hours)
    • Bridge - Systems Review - Linda (1 hour)
    • Bridge - Systems Review - Robert (1 hour)
    • Bridge - Systems Review - Tim C (1 hour)
    • Bridge - Systems Reviews - DP Bridge Party (1 hour)
      → See "Admin - Bridge - Study" (184.5 hours)
    • "Chawner (Marc) - Defense" (0.25 hours)
    • "Chawner (Marc) - Know Your Percentages" (0.25 hours)
    • "Chawner (Marc) - No Trump Declarer Play" (0.25 hours)
    • "Chawner (Marc) - Playing in a Suit Contract as Declarer" (0.25 hours)
Project 9: GeneralCulture22 (Total Hours = 139) Project 10: Languages23 (Total Hours = 22)
  1. Languages - Admin (Total Hours = 3)
    • 25Q3 Status Reports (1.5 hours)
    • 25Q4 Status Reports: Languages (1 hour)
    • 26Q1 Status Reports (0.5 hours)
      → See "Admin - Languages - Admin" (3 hours)
  2. Languages - Chinese
  3. Languages - French
  4. Languages - Greek (Classical)
  5. Languages - Hebrew (Classical)
  6. Languages - Italian
  7. Languages - Japanese
  8. Languages - Portuguese
  9. Languages - Spanish
  10. Languages - Thai
Project 11: Chess24 (Total Hours = 4.5)
  1. Chess - Admin (Total Hours = 2.5)
    • 25Q3 Status Reports (1.5 hours)
    • 25Q4 Status Reports: Chess (0.75 hours)
    • Chess - Discussions with Chris (0.25 hours)
      → See "Chess - Admin" (2.5 hours)
  2. Chess - Training (Total Hours = 2)
Project 12: Mathematics25 (Total Hours = 38.75)
  1. Mathematics - Reading / Writing (Total Hours = 35.75)
  2. Mathematics - Admin (Total Hours = 3)
    • 25Q3 Status Reports (1.75 hours)
    • 25Q4 Status Reports: Mathematics (0.5 hours)
    • 26Q1 Status Reports (0.75 hours)
      → See "Admin - Mathematics - Admin" (3 hours)
Project 13: HiQ26 (Total Hours = 4)



Table of the Previous 12 Versions of this Note: (of 32)

Date Length Title
01/04/2026 10:33:36 29483 Status: Summary Task List (YTD: 25Q4 - 26Q1)
01/01/2026 18:50:24 20779 Status: Summary Task List (YTD: 25Q4)
01/10/2025 10:53:46 49288 Status: Summary Task List (YTD: 24Q4 - 25Q3)
01/07/2025 11:31:12 42855 Status: Summary Task List (YTD: 24Q4 - 25Q2)
01/04/2025 13:17:46 34982 Status: Summary Task List (YTD: 24Q4 - 25Q1)
01/01/2025 18:15:50 24431 Status: Summary Task List (YTD: 24Q4)
01/10/2024 18:40:19 51546 Status: Summary Task List (YTD: 23Q4 - 24Q3)
01/07/2024 01:24:58 47861 Status: Summary Task List (YTD: 23Q4 - 24Q2)
01/04/2024 20:08:10 33990 Status: Summary Task List (YTD: 23Q4 - 24Q1)
01/01/2024 20:44:10 22009 Status: Summary Task List (YTD: 23Q4)
04/10/2023 21:59:02 45963 Status: Summary Task List (YTD: 22Q4 - 23Q3)
06/07/2023 00:43:12 41821 Status: Summary Task List (YTD: 22Q4 - 23Q2)



Note last updated Reference for this Topic Parent Topic
12/05/2026 10:16:46 1266 (Status: Summary Task List (YTD: 25Q4 - 26Q2)) Status: Summary (2026 - March)


Summary of Notes Referenced by This Note

Coxes Farm PID Note, Book & Paper Usage Status: Actual Detail Summary (2007 - 2026) Status: Bridge (2026 - March) Status: Chess (2025 - December)
Status: Consciousness Studies (2023 - September) Status: General Culture (2026 - March) Status: HiQ (2025 - December) Status: Languages (2026 - March) Status: Mathematics (2026 - March)
Status: Music (2026 - March) Status: Personal Identity (2026 - March) Status: Philosophy of Religion (2026 - March) Status: Priority Task List (2026 - April) Status: Summary - Actual versus Plan (2026 - May)
Status: Summary - Time Analysis (2026 - May) Status: Summary Task List (2026: April - May) Status: Thesis Dashboard (2026: May) Status: Web-Tools (2026 - March) Theo Todman's Bridge Page
Theo Todman's Philosophy Page Theo Todman's Philosophy Research Websites Maintained by Theo Todman    

To access information, click on one of the links in the table above.




Summary of Notes Citing This Note

Status: Bridge (2026 - March) Status: HiQ (2025 - December), 2 Status: Mathematics (2026 - March), 2 Status: Priority Task List (2026 - April) Status: Summary (2026 - March), 2
Status: Summary Task List (2026: April - May) Status: Web-Tools (2026 - March) Website - Outstanding Developments (2026 - May), 2 Website - Progress to Date (2026 - May), 2 Website Generator Documentation - Functors, 2

To access information, click on one of the links in the table above.




Text Colour Conventions

  1. Blue: Text by me; © Theo Todman, 2026




© Theo Todman, June 2007 - April 2026.Please address any comments on this page to theo@theotodman.com.File output:
Website Maintenance Dashboard
Return to Top of this PageReturn to Theo Todman's Philosophy PageReturn to Theo Todman's Home Page